AW PROTECT · FIBER OPTIC CONVEYOR MONITORING

One bearing failure can cost $2.5 million. The warning signal starts days earlier.

Distributed Acoustic Sensing turns a fiber optic cable along your conveyor into an early warning system. It listens to every bearing on the belt, pinpoints wear to within metres, and gives your maintenance team time to plan the repair instead of reacting to the breakdown.

Book a demo
IN PARTNERSHIP WITHHMA Group

THE RISK

One failed bearing can stop production for 4 to 8 hours.

A 20 km belt carries over 7,000 bearings. Point sensors and heat detection cable usually cover the drives and pulleys, and the rest of the belt relies on scheduled walk-downs and handheld thermal cameras.

By the time a bearing runs hot enough to notice, the acoustic damage has been building for days, and the belt is already heading for an unplanned stop.

$1M to $2.5MLOST PER UNPLANNED BEARING OR DRIVETRAIN FAILURE
7,000BEARINGS ON ONE 20 KM BELT, TOO MANY TO INSPECT BY HAND

From reactive monitoring to proactive maintenance

REACTIVE (TODAY)PROACTIVE (WITH FIBER)
CoverageDrives and pulleys onlyEvery bearing along the full belt
DetectionWhen heat or a failure appearsDays earlier, from the wear signature
Shutdown daysWalk the belt, test every rollerGo straight to the flagged section
OutcomeUnplanned breakdownScheduled repair window

HOW IT WORKS

From signal to scheduled repair

The system knows what healthy bearings and rollers sound like. When that acoustic signature changes, you know exactly where to send your team.

01

Listen

Fiber senses acoustics every 1 to 5 m along the belt, with no blind spots. Existing telecoms grade fiber can be used where the route already has it.

02

Detect

Early-stage wear is identified at 2 to 3 kHz and advanced wear at 6 to 8 kHz, before any rise in temperature.

03

Filter

AI filtered alarms give your maintenance team accurate alerts about potential risks, separating motor, structure and material noise from a true failure signature.

04

Plan

Maintenance hours go to the exact section that needs them, in a planned window instead of a reactive breakdown.

BUILT FOR A WORKING MINE

Fits your control room, your shutdown schedule and your team

Alerts where you already look

Alerts feed into your existing SCADA or Modbus systems and appear on your own conveyor schematic, located to the metre. The MaxView app and HMI display are available as extra channels.

Installed in your shutdown windows

Hardware installation takes about 7 days per kilometre of belt and is scheduled around planned shutdowns. Parallel belts can be fitted by separate teams at the same time, and calibration is done remotely while the belts run.

Very low maintenance

The sensing cable carries no power and no electronics, so nothing in the field needs servicing. Power is only needed at the controller, which we can access remotely to calibrate, reset and diagnose.

Local support, fast

We train your team to splice the cable on site so the system is never down for long. If you need us there, an engineer can be on site within 48 hours.

Built to last decades

SIL2 rated, immune to electromagnetic interference and corrosion, and engineered for a service life beyond 30 years. Controller upgrades are planned into the lifecycle so you stay on current technology.

A fast return

A single avoided bearing or drivetrain failure protects $1M to $2.5M in production. Fewer unplanned stops and targeted maintenance hours keep that return building.

USE CASE · OPENCAST MINE · 8 KM OVERLAND CONVEYOR

$320k of value every hour the belt runs. Bearing wear flagged days before failure.

An 8 km overland conveyor at an open-pit copper and molybdenum mine carries ore from the pit to the process plant. A single bearing or drivetrain failure meant 4 to 8 hours of downtime and $1M to $2.5M in lost production.

With Distributed Acoustic Sensing along the full belt, early-stage wear was flagged in the 2 to 3 kHz range, well before any rise in temperature. The maintenance team scheduled the repair instead of reacting to a failure, and unplanned downtime was brought under control on one of the mine's highest-value assets.

Scope my belts

“A $2 million failure starts as a signal in the 2 to 3 kilohertz range, days before anyone would otherwise notice it. You are the one who gets to see it first.”

FOR THE MINING ENGINEER RESPONSIBLE FOR THE BELT

ONE FIBER. THREE RISKS COVERED.

The same technology protects your perimeter and your pipelines

A single multichannel controller can run more than one application, each with its own acoustic or temperature profile.

Conveyor belt monitoring

Continuous condition monitoring of every bearing and roller, so failures are planned for rather than reacted to.

Perimeter intrusion detection

Fiber on the fence line detects people, vehicles, digging, cutting or trenching and gives your security team the location. Alerts can be silent, or trigger a siren to deter while response is on the way.

Pipeline leak and theft detection

Distributed temperature sensing picks up the shift around a leak or a tampered section on water, slurry or tailings lines, so losses are stopped at the exact point.

Questions mining teams ask us

How are we alerted when there is an issue?

Through the SCADA or Modbus systems your control room already uses, with the location shown on your conveyor schematic. You can add the MaxView app, an HMI display or email and SMS channels.

Does the conveyor need to stop for installation?

Yes, the hardware is fitted while the belt is stopped, so we plan installation around your scheduled shutdowns. Cable runs on both sides of the conveyor, and a 1 km belt takes about 7 days in total. Calibration happens remotely once the belt is running again.

What happens if the cable is damaged?

It is spliced, not replaced. We train your team and supply a splicing kit. Cable placement is refined to sit clear of routine belt servicing, which keeps breaks to a minimum.

How long does the system last?

The passive sensing cable is engineered for a service life beyond 30 years. The controller is a server, so a hardware refresh roughly every 5 years is built into the lifecycle plan to keep you on current technology.

Can perimeter alerts be set up our way?

Choose zone alerting (up to 8 zones per controller, each up to 1 km) or precise location alerting along the whole fence line. Alerts can go to phones, existing channels or a siren.

What does support look like?

Most issues are resolved remotely: we can log in to the controller to reboot, reset or recalibrate it. If an engineer is needed on site, we aim to be there within 48 hours.

See the signal first, not the failure.

Tell us your belt lengths, how many conveyors you run and your shutdown schedule, and we will scope the installation for your site.

Book a demo

AW PROTECT. Operational risk management: real-time condition monitoring that protects critical assets and keeps production running.

sales@africaweather.com | +27 (0)11 300 7480 | africaweather.com

Find out what one failure would cost on your belt

Tell us about your conveyors and our team will scope fiber monitoring for your site.

OUR PARTNERS

HMA Group

© 2026 AfricaWeather. All rights reserved.

Created with MailerLite